Aktau Gets a Container Hub
Kazakhstan and China's Lianyungang Port Group are building a container hub at Aktau, raising the Caspian port's capacity to 140,000 TEU a year.
What happened
In mid-July 2026 a new container terminal began operating at the port of Aktau, Kazakhstan’s main harbour on the Caspian Sea. The national railway company, Kazakhstan Temir Zholy (KTZ), marked the opening by processing the first container train to arrive at the complex.
The first phase consists of a container yard equipped with two container gantry cranes, other handling machinery, a terminal management system and cargo flow control systems. According to KTZ, it raises the port’s annual container handling capacity to 140,000 TEU (twenty-foot equivalent units, the standard measure of container volume) and cuts the time needed to process container trains.
The hub is a joint project of KTZ, Aktau International Sea Trade Port and China’s Lianyungang Port Group. Construction began in November 2024.
One chain from the Pacific to the Caspian
The project is designed as one link in a chain. Lianyungang, in China’s Jiangsu province, is a major port on the Yellow Sea and a long-standing starting point for China–Europe rail services. From there, trains run west across China to the Khorgos Gateway, a dry port on the Kazakh–Chinese border where containers are transferred between Chinese standard-gauge trains and Kazakhstan’s wider 1,520 mm network. From Khorgos, trains cross Kazakhstan to Aktau, where containers are loaded onto ships for Baku or Alat in Azerbaijan, and then continue by rail toward Georgia, Türkiye and Europe.
Bringing a Chinese port group into the Aktau hub means the same partners plan trains and terminals at both ends of the chain, from the Pacific coast to the Caspian.
Why the Caspian crossing is the weak link
The Caspian is where the corridor changes from rail to sea and back again. Containers arriving by train have to be unloaded, stored, loaded onto a ship, sailed across the sea, unloaded again and put on another train. Every step adds time and cost. Analysts have long identified this crossing as the corridor’s main bottleneck. The Hague Centre for Strategic Studies, in a March 2026 report, recommended prioritising large-scale port expansion at Aktau, Kuryk and Alat, together with renewal of the Caspian fleet.
Before dedicated container facilities, many Caspian ports handled containers alongside bulk and general cargo, with general-purpose equipment. A terminal built for containers, with its own gantry cranes and yard, can turn trains and ships around faster and make regular schedules possible. That matters because shippers on the corridor have complained less about the speed of trains than about unpredictable waits at the sea crossing.
Volumes are rising
The opening came as Caspian container traffic hit records. In May 2026 Kazmortransflot, the shipping subsidiary of Kazakhstan’s state oil company KazMunayGas, carried 7,451 TEU between Aktau and Alyat in a single month, more than double the 3,359 TEU of May 2025. It operates the container ships Barys, Berkut and Sunkar and the dry-cargo vessels Turkistan and Beket Ata on the route. Since 2019 it has carried more than 210,000 TEU between the two ports. SGBA covered the May record in a separate data note.
More investment is coming
Aktau is attracting European investors too. In October Germany’s Rhenus Group, which operates 23 container ports and around 70 port facilities in Europe, announced plans for a new trimodal container terminal at Aktau of at least 30 hectares and at least 150,000 TEU a year, the first of up to 14 terminals it wants to build along the corridor. It is working with KTZ and the port on a feasibility study. Our article on Rhenus’s plans has the details.
What it means for business
- Freight forwarders: more container capacity at Aktau should mean fewer delays and more predictable sailings across the Caspian. Ask carriers about scheduled, rather than as-available, departures.
- Port and equipment suppliers: later phases at Aktau, the Rhenus terminal and the matching expansion of Baku port point to further contracts for cranes, yard equipment and terminal software.
- Exporters in China and Central Asia: a tighter Lianyungang–Khorgos–Aktau chain makes the Middle Corridor easier to sell to customers in Europe.
- Shipowners: faster port turnarounds raise the value of each vessel on the Caspian, where the fleet is small and ageing.
What to watch
- Actual throughput at the new hub in its first year, compared with the 140,000 TEU capacity.
- Whether new ships arrive on the Caspian to match port capacity.
- Later phases of the KTZ–Lianyungang project, and progress on the Rhenus terminal.
SGBA view
Ports, not railways, decide how fast the Middle Corridor can grow. Aktau’s container hub is the kind of unglamorous investment that matters more than any headline target. The next constraint is the number of ships that can carry what the port can now handle.
By SGBA. Figures as reported at the time of writing. The capacity figure comes from the operator and has not been independently verified.
Sources
- Trend News Agency, "Kazakhstan boosts Middle Corridor with new Aktau container hub", 16 July 2026
- Euronews, "German logistics group Rhenus plans up to 14 terminals along the Middle Corridor", 9 October 2026
- The Astana Times, "Container traffic on Middle Corridor more than doubles in May", 4 June 2026
- The Hague Centre for Strategic Studies, "Reweaving Silk Roads", March 2026
SGBA checks every figure against the original source. How we work
